Experts in Specialist Piling Solutions.

Piletech is one of the few companies nationwide offering fully integrated foundation services, from design and manufacturing through to installation and certification. With over 40 years of expertise, our in-house team ensures quality, efficiency, and compliance with QBCC standards. Backed by robust documentation and a collaborative approach, we deliver safe, cost-effective results across engineering, civil, marine, and foundation projects of all sizes.

01

Design, manufacture, install, and certify — all in-house.

02

QBCC compliant with full documentation.

03

Safe, efficient solutions for projects of any scale.

Our Services

Design-and-construct services for civil, marine, mining, and infrastructure projects—flexible as principal or sub-contractor, always focused on smart, expert solutions.

Bored piling is a deep foundation method using drilled holes, ideal for heavy loads in urban or difficult ground conditions.

Screw piling is a quick, low-noise foundation method using steel shafts with helical plates, ideal for all soil types and limited-access sites.

Sheet piling uses interlocking steel sheets for earth retention, ideal for tight or waterlogged sites.

Marine piling supports structures like jetties and piers, using durable piles driven into seabeds for stability in coastal environments.

Pile load testing verifies a pile’s load-bearing capacity, ensuring foundation safety and performance before construction proceeds.

Home Four Rotate Arrow

Low Head Room

Home Four Rotate Arrow

Earth Retension System

Home Four Rotate Arrow

Design and Construct

Home Four Rotate Arrow

Civil Construction

Home Four Rotate Arrow

In-House Manufacturing

Recent Projects

Design-and-construct services for civil, marine, mining, and infrastructure projects—flexible as principal or sub-contractor, always focused on smart, expert solutions.

Pile Load Testing

Western Downs Solar Farm

September 4, 2025

Marine Construction

Revetment & Retaining Wall Works

March 28, 2025

Marine Construction

Revetment Reconstruction

August 25, 2025

Sheet Piling

Clapham Yard Phase 3

July 2, 2025